Why Do Renovations Go Over Budget? Explained
NCIDQ-Certified Interior Designer • NKBA Certified Kitchen & Bath Designer (CKBD)
Reviewed ·5 min read
A hallway you decide to paint while the painter is there and a wall you discover needs rebuilding can both add to the bill. Some costs can be priced before you sign, some are choices you make during the job, and some are the reason you set aside a contingency.
How Can an Incomplete Scope Put You Over Budget?
If you expect something to be replaced, moved, patched, or painted, ask where it’s covered in the quote.
Take a baseboard heater cover. It can look fine when you’re standing in the old room. Once the walls, flooring, and trim are new, that same cover can look a lot older than it did before. If you’re already on the fence about keeping it, I’d ask your contractor to price replacing it up front.
It’s an easy item to gloss over, and replacing it can open up a can of worms. A retrofit cover may fit, depending on the unit. In other cases, the heating element’s fins may need to be trimmed for the new cover to fit. If you wait until the room is nearly finished, the plumber may already have wrapped up and need to make another trip. You’re paying for the cover and the work it takes to fit it.
Do Late Decisions Really Cost More?
A late change can mean bringing back several trades, especially when it affects work they’ve already finished.
On one project, the scope called for replacing the recessed light fixtures in their existing locations. The homeowner was happy with that plan until he saw where the lights landed in relation to the new island. Once he saw they were off-center, he wanted them moved.
Moving a recessed light is a different job from replacing it in the same spot. The existing wiring may be too short to reach the new location, so the electrician may need to run new wiring. As we adjusted the layout, lights were added, some were removed, and we settled on two pendants over the island. The plasterer had to patch and repair the ceiling, and the painter repainted it three times as the changes played out.
These would have been changes on a drawing during design. During construction, each round meant more labor, materials, and time. If you’re planning a new island or moving a wall, look at the existing light locations on the proposed floor plan before you decide which ones to keep.
How Do Allowances Cause Budget Overruns?
An allowance is a placeholder for something you haven’t selected yet. If your selection costs more than the amount carried for it, you’ll need to budget for the difference.
I’ve seen quotes that assumed chrome plumbing fixtures because that was the usual starting point. Once the homeowner chose bronze or brass, the fixtures they wanted could cost two or even three times what had been carried. Even within the same brand, the model and finish can make a difference.
Put together a cart from a local retailer with fixtures you’d actually buy. Print it or share it with your contractor, with the models and finishes visible. Ask whether the allowance covers the fixtures alone or also includes items such as installation and tax. If the number is low, ask to have it revised or account for the difference before you commit to the budget.
What Is Scope Creep?
Scope creep is the “while you’re here” work you add once the project is underway.
The painter is finishing your bathroom, and suddenly the hallway leading to it looks dingy. Since the painter is already there, you decide to paint the hallway too. That’s an optional addition.
Now say you’re replacing kitchen tile with hardwood that meets the existing hardwood in the rest of the first floor. If you want the floors to blend without a visible finish break, you may need to refinish the connected flooring. Ask where the refinishing will stop and have that work priced with the kitchen. It may be part of getting the result you pictured from the start.
How Do Hidden Conditions Affect the Budget?
Demolition can reveal conditions that change how the planned work has to be done.
On a living room built-in project, I measured the old base cabinets three times. They were 24 inches deep. Once they came out, we discovered that the wall behind them had been built out. Removing that build-out exposed about three extra inches of depth we hadn’t planned for.
That affected more than the base cabinets. We had bookcases sitting above them and needed blocking in the center section to mount the TV. We could rebuild the wall to suit the planned cabinetry and provide the backing we needed, or order deeper base cabinets and adjust the installation. The homeowners chose to rebuild the wall.
Set aside a contingency before you start getting quotes so you have room for discoveries like this. See the renovation contingency explainer for help deciding how much to reserve.
How Do You Keep a Renovation on Budget?
Price the work you expect, make selections early, and keep a running total as the job changes.
Before you sign, walk through the scope room by room with your contractor. Ask what’s included, what’s excluded, and what still needs a price. Make as many selections as you can before the contract price is set, especially when those choices affect wiring, plumbing, or other work that happens early.
Once construction starts, ask for the price and any schedule impact before approving a change. Record approved changes in your Kitchen Budget Tracker or Bathroom Budget Tracker and keep an eye on how much of your contingency is still available.
Keep going on this topic
- Course The Renovation Blueprint, Phase 1: Dream + Define Define your scope, plan your space, and walk into every contractor conversation prepared.
- Article Why Most Kitchen Renovation Budgets Fall Apart Kitchen remodel budgets fail for one predictable reason, and it has nothing to do with the...
- Tool Kitchen Budget Tracker Enter your budget and get a target for each of 14 kitchen cost categories, then log what y...
- Article How Much Does a Kitchen Remodel Cost? Kitchen remodels range from $15,000 for a cosmetic refresh to $100,000+ for a full gut. Se...
- Tool Bathroom Budget Tracker Enter your budget and get a target for each of 15 bathroom cost categories, then log costs...
- Course The Renovation Blueprint, Phase 2: Build Your Budget Set three budget numbers before anyone prices your project: a target, a 15 to 20 percent c...