Skip to main content
Build Your Budget

How Much Contingency Should You Budget for a Renovation? Explained

Before you start getting estimates, set aside 5% to 20% of the most you’re willing to spend on your renovation, with a larger reserve for projects with more unknowns.

For a cosmetic refresh, 5% to 10% is a good starting point. If you’re doing some demolition or moving plumbing or electrical, plan on 10% to 15%. For a full gut or a project where there’s a lot you won’t know until the walls or floors are open, I’d set aside 15% to 20%. Then use what’s left to plan the work, including anything you’ll pay for separately from the contractor’s quote.

What is a renovation contingency?

A renovation contingency fund is money you set aside for surprises during your remodel.

Keep it separate from the money you’ve budgeted for the work you already know you’re doing. It’s there for things like rot under a bathroom tile floor or a vent pipe where you planned to put a recessed cabinet.

Nobody has x-ray vision. Some conditions only show up once work begins. If you already know something needs to be tested, repaired or replaced, include that cost in your planned budget.

Back to top

How much contingency should you plan for?

As a starting point, set aside 5 to 10 percent of your all-in maximum for a straightforward cosmetic refresh, 10 to 15 percent for a remodel with some demolition or plumbing and electrical changes, and 15 to 20 percent for a full gut or a project with significant unknowns.

I look at what we’re opening up and how much we know about what’s behind it. An older home can have more unknowns, especially if it’s been remodeled a few times and nobody knows what was done.

Here in Worcester, we have plenty of homes built around the turn of the last century. Depending on what’s already been updated, opening a wall or floor can uncover old wiring, rot or asbestos-containing pipe insulation. In homes built before 1978, lead-based paint is another consideration. See the EPA’s guidance on lead-safe renovations.

I lean toward the high end if we’re opening most of the walls or floors, moving plumbing or making structural changes and still have questions about what we’ll find.

Back to top

How do you calculate a renovation contingency?

Start with the most you’re willing to spend on the entire renovation. Multiply that number by the percentage you want to reserve, then subtract the reserve from your maximum.

If $75,000 is your all-in maximum and you reserve 15 percent, set aside $11,250. That leaves $63,750 for planned costs, including anything you’re paying for separately, like design fees or appliances.

Use the Renoversity® 3-Number Budget approach to break that target down by category.

Back to top

What does contingency actually get used for?

Use your contingency for unexpected costs you’re responsible for, such as repairing hidden damage or rerouting a pipe that turns up in the way.

Drain routing is a good example. If you’re moving a shower and can’t see the floor framing from below, you may only find out after demolition that a joist is in the way of the planned drain route.

If unexpected work is needed, ask what changed, what it will cost and whether it affects the schedule. Get the change in writing before approving the extra work. See What Is a Change Order? Explained for what to look for before you sign.

Back to top

Is contingency the same as an allowance?

An allowance is an amount included in a quote for a specific item you haven’t finalized. A contingency is a reserve for unexpected costs.

An allowance is a benchmark. It's how much the person quoting your project has allotted for a specific item. For example, a contractor might include a cabinetry allowance of $20,000 for a small kitchen.

If the cabinetry you select costs $30,000, you’re $10,000 over the allowance before any applicable contract adjustments. You can choose different cabinets, cut another planned expense or decide to use some of your reserve. I’d look at those first two options before dipping into money you may need later.

Back to top

Should you tell your contractor your contingency?

While you’re interviewing contractors, share what you’ve budgeted for the scope you’re asking them to price.

I usually keep my own reserve separate at this stage. I’ve heard contractors say you don’t need to set that much aside. I’d rather play it safe and know I’m well within my budget than cut it close.

Before signing, ask whether the quote includes a contractor-held contingency and how unexpected costs will be priced and approved. If there’s a contingency in the contract, ask what it covers and how any unused amount is handled.

Back to top

What happens if you don't use it?

Whatever is left in your own contingency fund is yours to keep once the work is complete and the final bills are paid.

You can leave it in savings or put it toward your next home project.

Back to top