What Are the Steps in a Kitchen Remodel? Explained

A kitchen remodel moves through planning, design, hiring, permits, and ordering before construction starts, then demolition, rough-ins, drywall, cabinets, countertops, backsplash, appliances, and a final walkthrough.

Every kitchen remodel follows roughly the same steps, whether it's a compact galley or a full gut renovation. The order matters because each step depends on the one before it. Cabinets can't be designed until the appliances are chosen. Countertops can't be templated until the cabinets are installed. The sink can't be connected until the countertop is in.

The kitchen remodel process falls into two parts:

Before construction: planning, design, selections, contractor quotes, permits, and ordering.

During construction: demolition through the final walkthrough.

This explainer covers each step of the kitchen renovation process, what happens at each one, and why the order of a kitchen remodel is set up the way it is.

General information for homeowners, not legal, financial, or professional advice. Codes, permits, contract requirements, and construction practices vary by project and location, so check with your local building department and the licensed professionals working on your project. See our Terms of Service. Last reviewed: October 2026.

What Are the Steps in a Kitchen Remodel?

Most kitchen remodels follow the same basic order: plan the scope and budget, design and make selections, hire a contractor, get permits and order materials, then demolition, rough-ins, inspections, drywall, cabinets, countertops, backsplash, appliances, and a final walkthrough.

Here are the kitchen remodel steps in order:

  1. Define the scope and budget. Decide what's changing and what you can realistically spend.
  2. Design the layout and make selections. Appliances, cabinets, plumbing fixtures, lighting, and finishes.
  3. Get quotes and hire a contractor. Sign the contract and pay the deposit.
  4. Apply for permits and order materials. Long-lead items like cabinets get ordered first.
  5. Prepare the house. Set up a temporary kitchen and protect the rest of the home from dust.
  6. Demolition. The old kitchen comes out.
  7. Framing and rough-ins. Wall changes, plus plumbing, electrical, and ventilation inside the open walls.
  8. Rough inspections. The inspector checks required work before it is covered.
  9. Insulation and drywall. Walls and ceilings are closed, finished, and primed.
  10. Flooring, for materials that go in before cabinets.
  11. Cabinet installation.
  12. Countertops. Templated, fabricated, then installed.
  13. Backsplash, sink, and faucet.
  14. Appliances, light fixtures, and finish electrical.
  15. Final paint, trim, and touch-ups.
  16. Final inspection, punch list, and walkthrough.

The exact sequence shifts from project to project. A cosmetic update skips most of the middle. A remodel that moves walls adds steps. The logic stays the same: decide first, build second, and never close a wall before required work inside it has been inspected.

Back to top

What Is the First Step in Remodeling a Kitchen?

The first step is deciding what the remodel needs to accomplish and roughly what you can spend. It isn't demolition, and it isn't calling a contractor. Scope and budget shape every decision that comes after.

A cosmetic refresh, a full remodel in the same footprint, and a new layout are three very different projects. Each one involves different trades, costs, and timelines. Knowing which one you're planning, and having a realistic budget range, lets a designer or contractor tell you early whether your wish list fits.

For typical price ranges, see Kitchen Renovation Costs, Explained. The free Kitchen Needs vs. Wants Checklist can help separate what's essential from what's optional before design begins.

Back to top

Should I Design My Kitchen Before Hiring a Contractor?

The design should be settled before you collect quotes, because a contractor can only price what has been defined. Whether you need a professional designer to get there depends on the project.

If you're replacing what you have in the same layout, and you already know what you want, you may be able to define the project yourself with help from your cabinet supplier. If the layout is changing, walls are moving, or you're unsure how to make the space work better, a trained designer is worth serious consideration.

Kitchen designers lay out kitchens every day. They spot opportunities a homeowner can miss, like better storage, a smarter work zone, or a more useful island. They also catch roadblocks early: an appliance door that collides with a drawer, a vent route that won't work, or a clearance that doesn't meet code. Most homeowners renovate a kitchen once or twice in their lives. Even if you don't hire full design services, having a professional review your layout before you order anything can prevent expensive mistakes.

Either way, a defined design gives every contractor the same information. When three contractors price a vague scope, you get three different guesses, and the gaps tend to come back later as change orders. Selections also drive cost, so a budget set before the finishes are chosen is a budget built on assumptions.

One exception is a design-build firm, where one company handles both design and construction. See How Does the Design-Build Process Work? and How Do I Get Accurate Contractor Quotes for a Renovation?

Back to top

When Should I Choose Cabinets and Appliances?

During design, before you collect contractor quotes. Appliances come first, because the cabinets are designed around their exact dimensions, clearances, and power, gas, water, and venting requirements.

A 36-inch range instead of a 30-inch one, a panel-ready dishwasher, or a built-in refrigerator changes the cabinet plan, and it can change the electrical, gas, and ventilation requirements. That's why the specific model matters at this stage, not just the type of appliance.

Choosing and ordering are separate steps. Cabinets and appliances are typically ordered after the contractor is hired and measurements are verified, so deliveries line up with the construction schedule instead of sitting in storage. Lead times are worth checking as each selection is made, while there's still time to choose something else.

The free Kitchen Remodel Decision Timeline shows which decisions need to be made when.

Back to top

When Do You Apply for Permits for a Kitchen Remodel?

After the contractor is hired and the scope is defined, and before construction begins. Often, the contractor applies for the building permit because the permit is tied to the work being performed and local licensing requirements.

A permit application usually includes a description of the work, and sometimes drawings, so the design has to be settled first. Plumbing, electrical, and gas work often require separate permits pulled by the licensed trades doing that work.

Review times range from same day to several weeks, depending on the municipality and the scope. That's why permits and material ordering often happen at the same time.

Which projects need a permit, and how inspections work, are covered in Do I Need a Permit for My Renovation?

Back to top

Can I Live at Home During a Kitchen Remodel?

Most homeowners do. Plan on a stretch of weeks without a working kitchen, and set up a temporary kitchen somewhere else in the house before demolition starts.

A temporary setup usually includes a refrigerator, microwave or countertop cooking appliance, and a nearby sink for washing up. Think through coffee, simple meal prep, food storage, dishwashing, trash, and where you'll clean small appliances. Those everyday details matter more after the first few days than people expect.

Dust protection for the rest of the house is set up at the same time, typically before demolition. The free Kitchen Remodel Survival Checklist covers what to set up. How long you'll be without a kitchen is covered in How Long Does a Kitchen Remodel Take?

Back to top

What Happens After Demolition?

Once the old kitchen is removed, the open walls, floor, and ceiling get assessed. Any framing changes come next, followed by rough plumbing, electrical, and ventilation work while everything is still exposed.

Demolition often uncovers conditions nobody could see before: water damage, outdated wiring, undersized framing, or pipes that aren't where anyone expected. These get addressed now, before anything new is installed. Sometimes that means added time and a change order. How those work is covered in What Is a Change Order?

This is the one point in the kitchen remodel process when the walls are fully open. Anything that needs to live behind them has to happen now.

Back to top

When Are Plumbing and Electrical Work Done?

Twice. Rough plumbing and electrical happen right after demolition and framing, while the walls are open. Finish plumbing and electrical happen near the end, after the cabinets and countertops are in.

Rough-in is the work inside the walls and floor:

  • Water supply and drain lines
  • Gas lines
  • Wiring and electrical boxes for outlets, switches, and lights
  • Ventilation ductwork for the range hood
  • Finish work, sometimes called trim-out, is what you see and use:
  • Sink, faucet, and disposal connections
  • Dishwasher and refrigerator water hookups
  • Outlets, switches, and cover plates
  • Light fixtures

The rough-in can only be as accurate as the design. The sink centerline, range location, and light and outlet positions need to be decided before this step, because moving them later can mean reopening finished surfaces.

Back to top

When Is Drywall Installed?

After the rough-in work passes required inspections and the insulation is in place. Drywall closes the walls, so everything inside them has to be complete and approved first.

Drywall is hung, taped, coated with joint compound, sanded, and primed. Finishing takes several days because each coat has to dry before the next one goes on.

Back to top

When Do You Paint During a Kitchen Remodel?

Painting is often done in two stages. Walls and ceilings are primed, and sometimes finish-painted, after drywall and before the cabinets go in. Final coats and touch-ups happen near the end, after installation work is complete.

Painting before cabinets can be faster and cleaner because there's less to cut around. Final touch-ups at the end cover the scuffs and patches that installation can leave behind. Some contractors save all finish paint for the end; either approach can work.

Back to top

Does Flooring Go In Before or After Cabinets?

It depends on the flooring. Tile and site-finished hardwood often go in before the cabinets. Floating floors, like many luxury vinyl plank and laminate products, usually go in after, because they need room to expand and generally shouldn't be pinned down by fixed cabinetry.

Professionals don't all handle this the same way, and the flooring manufacturer's installation instructions often decide it. Either way, the finished floor height has to be planned at appliance openings so the dishwasher and refrigerator can be installed and removed for service.

Back to top

When Are Kitchen Cabinets Installed?

After the drywall is finished and, depending on the flooring material, after the floor is down. Cabinets are the first major piece of the finish stage because the countertops, backsplash, and several appliance installations depend on them.

Every cabinet is leveled and secured to the wall and to the cabinets beside it. That precision matters: an uneven base cabinet can show up later as a gap under the countertop, an uneven seam, or doors and drawers that don't align properly.

Filler strips, end panels, moldings, and appliance panels are fitted as part of this step. Hardware and final door adjustments are often finished closer to the end.

Back to top

Do Countertops or Backsplash Come First?

Countertops come first. The backsplash is installed afterward so the tile or slab can be fitted to the finished countertop surface.

Stone and quartz countertops are templated after the base cabinets are installed because they have to fit the cabinets as built, not simply as drawn. Fabrication follows, which creates a normal pause in the schedule. After the countertop is installed, finish plumbing can be completed and the backsplash can go up.

One exception is a full-height backsplash cut from the same slab, which is often coordinated with the countertop fabrication process. For how countertop materials compare, see What's the Difference Between Quartz, Granite, and Marble Countertops? The free Countertop Selector Tool can help narrow the choice.

Back to top

When Are Appliances Installed?

Near the end of the kitchen remodel, after the cabinets are installed and the countertops are in or ready for the appliance connection they require. Several kitchen components depend on finished cabinet or countertop dimensions.

A dishwasher is secured to the underside of the countertop or to the cabinets beside it. A cooktop and an undermount sink require precisely located countertop cutouts, which is why exact specifications have to be in the fabricator's hands before the countertop is cut. A slide-in range fits between finished cabinet and countertop edges. The refrigerator can often be installed later because it does not depend on the countertop.

Delivery timing is worth coordinating. Appliances that arrive too early can get damaged on an active job site or take up space the crew needs.

Back to top

What Happens During the Final Walkthrough?

You and the contractor walk through the finished kitchen together, test everything, and write down anything that's incomplete, damaged, or not installed as agreed. That list becomes the punch list.

A final walkthrough usually covers:

  • Doors and drawers opening, closing, and lining up
  • Countertop seams, edges, and caulk lines
  • Tile, grout, and backsplash edges
  • Outlets, switches, and lights working
  • Water running, drains clearing, and no leaks under the sink
  • Every appliance running
  • Paint touch-ups and final cleaning

The final building inspection, when one is required, typically needs to pass before the permitted work is officially closed out. Your contract should spell out when final payment is due and how unfinished punch-list work is handled. See What Is a Punch List? and How Do Contractor Payment Schedules Work?

Back to top

How Long Does the Entire Kitchen Remodel Process Take?

Active construction for a full kitchen remodel often takes about 6 to 12 weeks. The whole process, from the first design decisions to the final walkthrough, typically takes several months.

The steps before demolition, including design, selections, quotes, permits, and cabinet lead times, can take as long as construction itself. Scope affects the kitchen remodel timeline more than square footage alone. Moving walls, plumbing, or gas adds time; keeping the existing layout can remove it.

For how long each stage takes and what causes delays, see How Long Does a Kitchen Remodel Take?

Go Deeper

Knowing the kitchen remodel steps is the starting point. Running them on your own kitchen takes a system. The free Kitchen Renovation Quick-Start Guide gives you a practical budget framework, decision timeline, and quality-control checkpoints to help you plan the project in the right order. Start with the first lesson.